
Our Work
2024
DTE Energy (Michigan)
- Fort St. Phases 5.3-5.5: Installed 4,200' of 24" steel main, 120' of 20" steel main, 2,570' of 16" of steel main, 70' of 8" steel main and 2,000' of 8" plastic main along Fort St. from W. Grand Blvd. to 14th St. and along 14th St. from Fort St. to Bagley St. This project included a 16" and 8" directional drill along 14th St.
- System Reliability
2023
DTE Energy (Michigan)
- Fort St. Phases 7.2-7.4: Installed 1,230' of 20" steel main, 7100' of 16" steel main, 1,100' of 12" plastic and 7,425' of 8" plastic main on Larnded St. and E. Jefferson Ave. from Rivard St. to Station B on E. Jefferson Ave., Detroit. - work continued into 2024
- System Reliability
2022
DTE Energy (Michigan)
- Grosse Ile Second Feed: Directional drilled approximately 7,700' of 8" steel pipe from Trenton at W. Jefferson to Grosse Ile at the W. River Access Rd. and open cut from drill exit to Meridian Rd.
- Fort St. 3.1: Installed approximately 2,800' of 24" steel pipe down Fort St. from Miller Rd. to Woodmere and 1,250' of 12" pipe along Woodmere St. from W. Fort St. to Dearborn St., Detroit.
- Fort St. 5.1: Installed approximately 200' of 16" steel pipe along 14th St. to Marantette, Detroit and 350' of 12" steel pipe along Marantette, Detroit
- Southfield River Rouge Bore: Installed 2,720' of 24" steel pipe via directional drill along Southfield Freeway under Michigan Ave. and the Rouge River.
- System Reliability
2021
DTE Energy (Michigan)
- Euclid: 1000' of 16” steel pipe along Euclid St. from Colfax Ave. to Riopelle St., Detroit
- Miller Rd. - Ford/AK Steel Separation: Installed approximately 3,800' of 12" steel down the middle of Miller Rd., Dearborn via open cut and directional drill
- System Reliability
2020
DTE Energy (Michigan)
- Euclid: 1000' of 16” steel pipe along Euclid St. from Colfax Ave. to Riopelle St., Detroit
- System Reliability